Ashburn VA
AI Readiness Index
Composite readiness score for Ashburn VA covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.
Is Ashburn VA a good location for an AI data center?
Ashburn VA scores 76/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 69/100 power score (based on $0.08/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.
Key Data Points
- Overall Score: 76/100 (Band B)
- Power Score (TTPS): 69/100
- Fiber Score: 98/100
- Permit Velocity: 70/100
Explore More
Financial Tools for Ashburn VA Site Selection
CSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open ToolSite Selection Analysis: Ashburn VA
Ashburn VA is a Tier 1 Market with a composite readiness score of 76/100. This market is suitable for deployment with minor infrastructure investments.
Power Infrastructure
Local power costs of $0.08/kWh place Ashburn VA at the mid-point of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.
The 'Site Selection' Deep Dive
- The 5 substations in Ohio that still have capacity.
- Why 'Site Control' is meaningless without power.
- Full TTPS scores for Ashburn VA queue positions.