San Jose CA
AI Readiness Index
Composite readiness score for San Jose CA covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.
Is San Jose CA a good location for an AI data center?
San Jose CA scores 79/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 75/100 power score (based on $0.18/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.
Key Data Points
- Overall Score: 79/100 (Band B)
- Power Score (TTPS): 75/100
- Fiber Score: 98/100
- Permit Velocity: 70/100
Explore More
Financial Tools for San Jose CA Site Selection
CSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open ToolSite Selection Analysis: San Jose CA
San Jose CA is a Tier 1 Market with a composite readiness score of 79/100. This market is suitable for deployment with minor infrastructure investments.
Power Infrastructure
Local power costs of $0.18/kWh place San Jose CA at the higher end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.
The 'Site Selection' Deep Dive
- The 5 substations in Ohio that still have capacity.
- Why 'Site Control' is meaningless without power.
- Full TTPS scores for San Jose CA queue positions.