Readiness Score • 2026 Assessment

San Jose CA
AI Readiness Index

Composite readiness score for San Jose CA covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.

Summary2 Data Sources

Is San Jose CA a good location for an AI data center?

San Jose CA scores 79/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 75/100 power score (based on $0.18/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.

Key Data Points

  • Overall Score: 79/100 (Band B)
  • Power Score (TTPS): 75/100
  • Fiber Score: 98/100
  • Permit Velocity: 70/100

Explore More

Financial Tools for San Jose CA Site Selection

FREE TOOL

TTPS (Time-to-Power Score)

Interconnection queue wait time analysis

Open Tool
FREE TOOL

CSS (Curtailment Stress Score)

Real-time grid congestion and curtailment risk by zone

Open Tool
PRO TOOL

PAY (Power-Adjusted Yield)

Site-level investment attractiveness scoring

Try Pro Tool
PRO TOOL

Connectivity Analyzer

Evaluate fiber and network connectivity for sites

Try Pro Tool
79
Band B
75
Power Score
98
Fiber Density
75
Cooling Efficiency
70
Permit Velocity

Site Selection Analysis: San Jose CA

San Jose CA is a Tier 1 Market with a composite readiness score of 79/100. This market is suitable for deployment with minor infrastructure investments.

Power Infrastructure

Local power costs of $0.18/kWh place San Jose CA at the higher end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.

Critical Market Intelligence

The 'Site Selection' Deep Dive

  • The 5 substations in Ohio that still have capacity.
  • Why 'Site Control' is meaningless without power.
  • Full TTPS scores for San Jose CA queue positions.

Compare Other Markets