Dallas–Fort Worth TX
AI Readiness Index
Composite readiness score for Dallas–Fort Worth TX covering power availability, fiber proximity, cooling infrastructure, and regulatory velocity.
Is Dallas–Fort Worth TX a good location for an AI data center?
Dallas–Fort Worth TX scores 82/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 77/100 power score (based on $0.05/kWh local rates), 98/100 fiber connectivity, and 70/100 for permit velocity.
Key Data Points
- Overall Score: 82/100 (Band B)
- Power Score (TTPS): 77/100
- Fiber Score: 98/100
- Permit Velocity: 70/100
Explore More
Financial Tools for Dallas–Fort Worth TX Site Selection
CSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open ToolSite Selection Analysis: Dallas–Fort Worth TX
Dallas–Fort Worth TX is a Tier 1 Market with a composite readiness score of 82/100. This market is suitable for deployment with minor infrastructure investments.
Power Infrastructure
Local power costs of $0.05/kWh place Dallas–Fort Worth TX at the lowest end of the national cost curve. As a Tier 1 hub, expect 18-24 month interconnection timelines in major substations.
The 'Site Selection' Deep Dive
- The 5 substations in Ohio that still have capacity.
- Why 'Site Control' is meaningless without power.
- Full TTPS scores for Dallas–Fort Worth TX queue positions.
PDF Format • 45 Pages • Instant Access