Is Las Vegas NV a good location for an AI data center?
Las Vegas NV scores 79/100 on our AI Readiness Index, earning a "B" rating. Key factors include a 65/100 power score (based on $0.07/kWh local rates), 85/100 fiber connectivity, and 88/100 for permit velocity.
Key Data Points
- Overall Score: 79/100 (Band B)
- Power Score (TTPS): 65/100
- Fiber Score: 85/100
- Permit Velocity: 88/100
Explore More
Financial Tools for Las Vegas NV Site Selection
CSS (Curtailment Stress Score)
Real-time grid congestion and curtailment risk by zone
Open ToolSite Selection Analysis: Las Vegas NV
Las Vegas NV is a Tier 2 Market with a composite readiness score of 79/100. This market is suitable for deployment with minor infrastructure investments.
Power Infrastructure
Local power costs of $0.07/kWh place Las Vegas NV at the mid-point of the national cost curve. As a Tier 2 market, interconnection queues are typically shorter than Ashburn or Silicon Valley.
The 'Site Selection' Deep Dive
- The 5 substations in Ohio that still have capacity.
- Why 'Site Control' is meaningless without power.
- Full TTPS scores for Las Vegas NV queue positions.